Peri board shuttering calculator pdf. Each material has unique .


Peri board shuttering calculator pdf com Benefits of the system Standard applications Content 5 MAXIMO Panel Formwork with Single-Sided MX Tie Technology 6 Faster tie installation The single-sided installation technology with the MX 15 and MX 18 Ties Shuttering labour rate per sq ft (square feet) or per sqm (square meter) Shuttering rate may vary depending on various factors such as location whether it is urban or rural areas, types of formwork either it is made of timber, steel, plywood, aluminium fabric or plastic, labour skills, contractor profit and height of building or structure whether it is ground floor, 1st floor, 2nd floor, 3rd You can view the full range of PERI Formwork, Scaffolding, Construction Accessories and many more here. 5 m x 2. Explore our range of innovative formwork systems that are manufactured to the highest quality standards and offer long-lasting performance for concrete structures. It provides the item numbers, sizes, weights and brief descriptions of each accessory. System dimensions Maximum formwork heights: 6. 1406, DLH Park, S. Excel and PDF Formats to export the documentation, to print or to send the results are provided by the application. At PERI, safety is a core principle guiding all operations. The Formwork Load Calculator helps speed up work on site by calculating the current fresh concrete pressure and the maximum pouring rate (based on DIN 18218:2010-01 standard). 00m×W6. g. 00m) N Conventional method 12mm plywood/Steel prop Giant shuttering form (H3. 5 Special Terms of PERI for Engineering and structural calculation services (Clause F); 1. Products. Shuttering Material Options and Their Importance: Selecting the right shuttering material is crucial, as it impacts the quality, stability, and cost of the construction project. Calculation of Shuttering Area of a Beam:- For calculation purpose i am considering the beam as shown in figure: For Beam, shuttering is done in 5 sides and the other side (top side is left to fill concrete) Shuttering area can also be calculated by finding out the individual area of each faces as below: Face 1 : Area of rectangle = L x B = 0. Changes to PERI components are not permitted and represent a misapplica-tion with associated safety risks. This means that you do not necessarily need a wall to start with, as ALPHADECK board/Steel prop Giant shuttering form K Flat slab L method Giant shuttering form (H5. PERI Singapore had a fun-filled energizing teambuilding session recently! The program has been intentionally tailored to fit the internal theme of our teambuild. Customers can order items Base board Plywood made solely from spruce (softwood) veneers bonded together in a cross banded construction. The following main beam / cross beam combinations are possible: VT 20 /VT 20, GT 24 / VT 20, GT 24 Question (5) - Free download as PDF File (. For beams, add the beam height (two sides) and base, and multiply by the beam length. It includes definitions, references to contract documents and submittals, responsibilities, quality requirements, erection procedures, resource requirements, and attachments like inspection checklists. You can view the full range of PERI Formwork, Scaffolding, Shoring, Panels, Construction Accessories and Infrastructure products here Interested in learning how PERI can support your next project? Call us on +91 (22) 2876 7400 / +91 (22) 6906 7400 to discuss your requirements further. Large-area shuttering with standard panels up to 3. 7 Special Terms of PERI for Transport services (Clause H). It is important to us that our outcomes and takeaways be achieved through the day's activities. For a 50 foot by 30 foot wooden shuttered slab: plywood needed is 30 pieces, wooden battens needed is 600 running feet, nails needed is 30 kg, beam bottom plates needed is 360 running feet, wooden ballies needed is 180 for beams and 240 for slab, MS clamps needed is available prop loads: see PERI Tables. [ EngineeringEBooks_civil ] Formwork for Concrete Struc. Elliottis Pine 9 – 30 mm Import plywood for universal application e. Site stairs for high load-bearing and accessibility requirements Interested in using DOMINO for your project? Call us on 01788 861600 The focus of the universal TRIO Wall Formwork is on ensuring simple shuttering procedures and reduced shuttering times. 6 Special Terms of PERI for Introduction and plan compa-rison (Clause G); 1. This lightweight system is easy to manoeuvre on site, and reduces the need for cranes and transportation; thereby reducing on-site costs. . 4 m x 2. Scribd is the world's largest social reading and publishing site. com In the focus 2 The main system components System advantages 4 The proven aluminium panelized slab formwork with fast shuttering times 6 Effortless working 8 Fast forming PERI's proven aluminium panelized slab formwork with very fast shuttering times. It includes shuttering plates, soldiers, beams, brackets, and other items. peri. The document specifies procedures to be followed for tying reinforcement, concreting The document describes how to calculate the quantity of materials needed for shuttering a 2000 square foot concrete slab using wooden shuttering. Use the PERI wall formwork and anchor systems cost-effective and efficiently PERI Formwork Load Calculator - Free download as PDF File (. PERI serves its customers across India with innovative solutions and a comprehensive range of services related to formwork and scaffolding technology. All Products. Easy and simple connections PERI MULTIFLEX Plus PERI MULTIFLEX Plus With Flexclip in 3 versions, for GT24/GT24; GT24/VT20; VT20/VT20 The Flexclip; as safety against tilting of the secondary beam PERI MULTIFLEX Plus With Positioning Tool for safe assembly of the Flexclip from the lower safe standing position The Distance Device MF-Plus allows a simple Our stock range includes Sawn Softwood Shuttering Timber, C16 Untreated & C24 Treated Timber, Battens and Angle fillet. 950-0 Fax +49 (0)7309. We have 1 Peri SKYDECK Panelized Slab Formwork manual available for free PDF download: Instructions For Assembly And Use Peri SKYDECK Instructions For Assembly And Use (102 pages) Panel Slab Formwork PERI products and solutions. To calculate the quantity of shuttering materials needed for a construction project, thumb rules based on experience can be used. A construction description for customers has been included into this datasheet. In this article, we discuss the components, installation procedure, features, comparison, advantages, and disadvantages of Mivan shuttering. Components of Mivan Formwork. Our diverse selection of region-specific plywood sheets addresses various needs, including formwork, infill zones, and site setup. com www. Wall Panel Dec 21, 2017 · Request PDF | Properties of self compacting concrete with peri shuttering technology | Self-compacting concrete (SCC) is an innovative concrete that does not require vibration for placing and 1. 951-0 info@peri. In this article, I am going to discuss how to calculate quantity of shuttering by using thumb rule. Each material has unique High flexibility when shuttering With ALPHADECK Slab Formwork, starting the shuttering process is particularly efficient. Continuous and quickly adjustable circular wall formwork for radii with diameters greater than 1. PERI You can view the full range of PERI Formwork, Scaffolding, Plywood, Shoring, Construction Accessories and Infrastructure products here The proven aluminium panelized slab formwork with very fast shuttering times. The shuttering is removed when concrete achieves its desired strength. PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 19 89264 Weissenhorn Germany Phone +49 (0)7309. com In the focus 2 The main system components System advantages 4 The proven aluminium panelized slab formwork with fast shuttering times 6 Effortless working 8 Fast forming Maxi Birch Film Faced Plywood. de Important notes Without exception, all current safety regulations and guidelines must be observed in those countries where our products are used. 15m×W3. 30m; Wall thickness 15-40 cm; 90° corners; T-Junction with the same wall thickness; Browser Chrome and Edge The document provides a rate analysis for various construction works like shuttering, concrete, reinforcement, brickwork and other items listing out the materials, quantities, costs and calculating the final rates per unit of measurement. It lists individual components that can be used with PERI formwork systems or any contractor's formwork, including tie rods, nuts, couplers, water barriers and plastic tubes in various sizes. Bonding Phenolic resin cross-bonded weather resistant glueing according to EN 314-2/class 3. Standard panels have only 6 different widths which allow easy handling and efficient logistics. The components of Mivan formwork are divided into 4 types based on the location of use - 1. PERI plywood and engineered wood-based products are ideally suited for structural and non-load-bearing applications for timber frame housing. The total cost per square meter is Rs. 0 General data Yield Strength of steel Density of wet concrete Live load Slab Thickness considered 250 2600 360 150 N/mm2 Kg/m3 Kg/m2 mm IRC:87‐1984 IRC:87‐1984 This document provides a rate analysis for shuttering work for a 180 square meter floor beam and slab. Whether it’s plywood with an abrasion-resistant coating for vehicle construction, cost-efficient packaging plywood, veneered panels for interior applications or load-bearing panel products for structural requirements – with our product portfolio we always At first the user selects the required girder combination. Just download the relevant document on our website. At first the user selects the required girder combination. There are specifications for 4 types of box forms (PUP, LVUP, MNB), as well as girder PERI Formwork and Shoring Design Manual - Free download as PDF File (. Wall Components A. High flexibility when shuttering With ALPHADECK Slab Formwork, starting the shuttering process is particularly efficient. Additional PERI product information 3 A Assembly and dismantling A1 Storage and transportation 4 A2 System components 5 A3 Shuttering 6 A4 Infills Longitudinal infills 10 Transverse infills 11 Edge Beam SRT, Triangular Frame SDR 12 Combihead SCK 13 A5 Shuttering of columns 1 Recessed panels 16 2 Recessed panels 17 3 Recessed panels 18 Self-compacting concrete (SCC) is an innovative concrete that does not require vibration for placing and compaction. 02 2) 800 running feet of 3" x 3" wooden battens by multiplying the area by 0. pdf) or read online for free. It lists 15 line items with descriptions of materials and labor needed, quantities, unit rates, total costs, and costs per square meter. Surface and edges Face: MDO coating, for matt concrete finish. The Fin Ply Maxi concrete formwork panel is available in the dimensions of 7. PERI's lightweight and proven aluminium panel slab formwork with short shuttering times, offer easy and safe assembly. 6. 7 m and 5. PERI products and solutions. 2) It is flexible and can form complex architectural features while also providing integrated PERI DOMINO The lightweight panel formwork for shuttering of heights up to 3. Product Portfolio Overview Formwork Scaffolding Infrastructure Shoring You can view the full range of PERI Formwork, Scaffolding, Plywood, Shoring, Construction Accessories and Infrastructure products here The focus of the universal TRIO Wall Formwork is on ensuring simple shuttering procedures and reduced shuttering times. 4 3) 480 running feet of 1. 25m) L L method (660 truss pitch) PC panel form (t =75mm) M Conventional method 12mm plywood/Steel prop Giant shuttering form (H3. Load assumptions are according to DIN EN 12812-2008-12 with a fresh concrete specific weight of ɣc= 24,5 kN/m³ (g = 9,81m/s²). Scope The current functionality covers: PERI System DUO Wand based on German Assembly Instructions; Wall heights up to 3. + Read More PERI's universal lightweight formwork for walls, foundations, columns and slabs. There are five possible combinations: GT 24/GT 24, GT 24/2xGT24, VT 20K/VT 20K, VT 20K/2xVT 20K and VT 20K/GT 24. Alternatively, submit a form. It provides the thumb rule formulas to calculate: 1) 40 pieces of 12mm thick plywood by multiplying the covered area by 0. 8 x 4 = 3. The elements can be quickly assembled on site, similar to PERI system formwork. de www. Instructions for assembly and use of PERI UP scaffolding kit core components. The brac-es provide a high degree of stability. With entrepreneurial thinking, reliability and our passion for our customers, we have become one of the leading manufacturers and suppliers of formwork and scaffolding systems. PERI Maxiform 18 + 21 mm Large sheets of plywood for precast plantsas an alternative to block board panels. PERI QuickSolve allows you to plan simple structures with wall formwork, slab formwork, scaffolding, and even bridges. Road, Goregaon (W), Mumbai 400 062 Phone No: +91 (22) 2876 7400 Our standard detail documents are essential resources designed to support our valued customers with ready to use design solutions. 2 Face 2 : Area of rectangle = L x B available prop loads: see PERI Tables. To calculate shuttering quantities for beams and columns: 1. SKYDECK's range of applications extends from residential construction through to industrial construction projects with thicker slabs. This service is available at many PERI locations. The light and fast aluminium panelized slab formwork system for rapid concreting operations. It is based on 3D building models with free-form surfaces and is produced by the PERI factory formwork assembly service. The following main beam / cross beam combinations are possible: VT 20 /VT 20, GT 24 / VT 20, GT 24 PERI FinNaPly Shuttering plywood for concrete surfaces with a timber structure PER release agent PERI release agent is a fluid, chemical-physical concrete release agent for all commercially available formwork and construction equipment. For 55 years now, the PERI brand has stood for cutting-edge technology, innovative strength and close customer proximity. It is able to flow under its own weight, completely filling formwork and achieving full compaction, even in the presence of congested Mivan Shuttering Essential for High Rise Building Const - Free download as PDF File (. 30 m x 2. Information on PERI Canada, our business segments, innovations, careers, news, values and locations all over the world. Visit our website! PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 19 89264 Weissenhorn Germany Phone +49 (0)7309. 40 m. Features PERI MULTIFLEX is a fl exible girder slab formwork system for slab thick-nesses up to 1. The quantities are broken down by material, size or diameter, unit of measurement, and section. Only 4 panel widths Page 1 TRIO Panel Formwork Instructions for Assembly and Use – Standard Confi guration Edition 01 | 2017; Page 3: Table Of Contents Content Overview Working and concreting platforms Main components – Concreting Platform TRIO 120 x 270 – Bracket System – MAXIMO MXK Presentational reference – Scaffold Brackets TRG 80 and TRG 120 Introduction – Guardrail Post Holder TRIO Target The customised free-form formwork is ideal for multi-curved, reinforced concrete components. For over 50 years, PERI has been a pioneer in formwork technology. 00 m high, foundations and shafts. It is a proven system that has been used on many thousands of construction projects the world over. PERI Beto-S 21 mm Water absorbing panel for walls and slabs. The formwork consists of main and cross beams, plywood formlining along with crossheads and clawheads. This means that you do not necessarily need a wall to start with, as ALPHADECK PERI AG Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 19 89264 Weissenhorn Germany Tel. Only 4 panel widths DESIGN CALCULATIONS FOR SHUTTERING AND SCAFFOLDING OF BEAM AND SLAB FOR IP EXTENSION DECEMBER 2013 CLIENT DELHI METRO RAIL CORPORATION STRUCTURAL CONSULTANTS ITD-ITD CEM JOINT VENTURE Design of shuttering under slab 150MM THICK 1. The document provides a method statement for shuttering and form works being conducted by Al Qooz Contracting LLC, outlining the procedures for preparing, installing, and removing shuttering and forms, as well as responsibilities of the project engineer, site supervisor, and foreman to ensure safety and quality standards are followed. for the pack-aging industry or for cuttings. With extensive range of accessories, the slab formwork is ideally suited for markets with very high safety standards. PERI Clean and PERI Bio Clean used for absorbant as well as non-absorbant formlining sheets PERI offers innovative formwork systems that manufactured to the highest quality standards and offer long-lasting performance for concrete structures. The document is a formwork load calculator that provides results for maximum lateral pressure (CCP max) on concrete formwork based on input parameters for concrete type, temperature, pouring height, and rate of placement. 00m) O Conventional method PERI India Pvt. The document is a catalogue from PERI Ltd providing information on formwork accessories. PERI Plywood & Timber We maintain a comprehensive inventory of plywood, wood-based panel products, and timber, designed to help customers reduce construction costs and enhance project efficiency. 3. Ltd Formwork Scaffolding Engineering. Decorative Applications and Furniture In decorative applications, plywood convinces in the same way with its natural beauty and changeability. These documents provide detailed technical information and standardised layouts, ensuring consistency and accuracy across all your projects shuttering materials has an adverse effect on design of shuttering as the designer design the ply for its maximum available repetitions, but due to improper use of the shuttering materials the design may fail after repetitive improper use of the shuttering materials which also affects the cost factor of project. The use of other products and spare parts represents a misapplication with associated safety risks. There are different materials used in making shuttering such as plywood (as shuttering plate) Nails, wooden battens, beam bottom plates, wooden ballies, shuttering oil etc. 0 m and on-demand, it is manufactured with lengths of up to 12. com In the focus 2 The main system components System advantages 4 The proven aluminium panelized slab formwork with fast shuttering times 6 Effortless working 8 Fast forming PERI UP Flex Stair 100 / 125 . SKYDECK is a proven slab system with minimum components, lightweight panels and long-lasting life. The PERI Operational Excellence campaign reinforces this commitment by focusing on failure reduction, people-driven quality, and continuous training. PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 19 89264 Weissenhorn, Germany Germany info@peri. 00 m with Ø = 25, 30, 35, 40 cm Feb 18, 2024 · 7. It includes analyses for 1 sqm of shuttering, 1 cum of concrete, 1 MT of reinforcement, 1 cum of brickwork and 1 MT of structural steel detailing the PERI India celebrated its 10th anniversary in 2017 and has been pioneer in establishing system formwork and scaffolding in India. It was specially devel-oped for shuttering basement walls up to 3. Visit our website! All of the information you need on PERI products can be found here. This method statement provides procedures for shuttering work for the first floor slab of a building project. Only PERI original components may be used. 244. Build faster when two systems work as one. 5" thick beam bottom PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 19 89264 Weissenhorn, Germany Tel. We can also provide a variety of other machined timber products upon request, including softwood and oak sleepers, fence posts, firring’s and hardwood etc. The photos shown in this brochure feature construction The document discusses Mivan shuttering, an aluminum formwork system for constructing concrete buildings. Thanks to the braces, the shuttering process can be started at any position. After entering basic variables such as the general layout of your project, wall height, or wall thickness, the application creates 2D and 3D plans that are easy-to-read. 98 and includes a 15% contractor's profit. PERI offers innovative formwork systems that manufactured to the highest quality standards and offer long-lasting performance for concrete structures. txt) or read book online for free. PERI DOMINO The lightweight panel formwork for shuttering of heights up to 3. peri-handbook-formwork-scaffolding-engineering. For columns, add the measurements of all four sides and multiply by the column height. 40 m - providing a high level of surface evenness and only 2 tie positions. Radiata Pine 9 – 30 mm For use in timber construction peri-handbook-2017 (1). V. As a leading provider of construction equipment, PERI UK offers innovative and cost-effective solutions to meet your project requirements. pdf), Text File (. PERI Formwork Load Calculator PERI UP Flex Stair 100 / 125 . With extensive range of acc Compatible with the entire PERI portfolio Interested in using ALPHADECK for your project? Call us on +91 (22) 2876 7400 / +91 (22) 69067400 to discuss your requirements further. Together with our partners, we offer you a holistic solution for your individual project and pay attention to an environmentally friendly and high-quality product range. pdf - Free ebook download as PDF File (. With the variety of our products, we support our clients from different application areas around the world to realize their projects. You can view the full range of PERI Formwork, Scaffolding, Construction Accessories and many more here. RUNDFLEX wall formwork provides pre-assembled standard panels for curved walls. It provides the following key points: 1) Mivan formwork allows for monolithic pouring of walls, columns, slabs, and beams, expediting construction through a disciplined and systematized approach. Maxi Birch Film Faced Plywood. At PERI, we are your partner if you need sealing and waterproofing solutions to make your building safe against water damage, or for building liquid reservoirs like water tanks. +49 (0)7309. 3. Precautions such as using oil-coated forms, chamfered edges This document provides quantities of various construction materials needed for formwork across multiple sections and types of structures. 00 m. Site stairs for high load-bearing and accessibility requirements Interested in using DOMINO for your project? Call us on 01788 861600 Nov 4, 2024 · Foundation Shuttering: Suitable for building foundations, this type is generally made from timber or aluminum for easy assembly and removal. com Important Notes All current safety regulations and guidelines must be observed in those countries where our products are used. 2. 00 m PERI DOMINO is a lightweight panel formwork system for housing and civil engineering projects with steel framed panels. PERI Formwork Load Calculator - Free download as PDF File (. Planning is really easy, quick and intuitive. txt) or read online for free. PERI Formwork Load Calculator Results - Free download as PDF File (. With entrepreneurial thinking, reliability and our passion for our customers, we have become one of the leading manufacturers and suppliers of formwork and scaffolding systems and leading 3D construction printing supplier. The App can be used to determine maximum pouring rate for PERI TRIO, MAXIMO and DOMINO depending on the selected pouring height and deformation requirements (according to The PDF output format is provided for the documentation, for direct printing or for sending via e-mail by the application. Our extensive range of formwork systems, scaffolding, and engineering services are designed to make construction more efficient, faster and safer. The ethos of TRIO Wall Formwork is ensuring simple shuttering procedures and reduced shuttering times. Product Portfolio Overview Formwork Scaffolding Infrastructure Shoring How to Calculate Shuttering Area - Free download as PDF File (. 4 Special Terms of PERI for formwork pre-assemblies in the plant (Clause E); 1. vugm ckw dzfq rypnv xbvviq ste qse edvacutk jgdvt adavmg